Hi,
I have a form where I have 3 fields (let's call them A, B, C)
The overall result is determined by a calculation between these three fields. So for example, A*B/C
I was wondering if this was possible and how I would go about it. I would need the result of the form passing through to the confirmation so I'd need it as a merge tag.
Cheers,
Steve